This guide points you to the right office. It is not legal advice and it does not replace a call to that office. Permit rules change, and the final word always belongs to the building department for your address.
What never needs a permit
The emergency and drying stages are not construction. You do not need permission to:
- Shut off water and extract it
- Remove wet carpet, pad and damaged contents
- Set up air movers and dehumidifiers
- Clean and disinfect
Start those straight away. Waiting for paperwork while materials stay wet only adds damage. The first step is water extraction.
What usually does not
Cosmetic, like-for-like repairs are generally treated as maintenance in most places. That commonly includes painting, replacing a section of drywall, laying new carpet or flooring, and refitting trim. "Generally" is the important word. Confirm it for your address.
What often does
Permits come into play when a repair goes beyond finishes.
| Type of work | Why it draws a permit |
|---|---|
| Structural repair | Replacing joists, studs, beams or subfloor affects the building's strength |
| Electrical work | Replacing submerged wiring, outlets or a panel is a safety matter |
| Mechanical work | Replacing a furnace, ductwork or water heater involves fuel and venting |
| Plumbing work | New or rerouted supply and drain lines |
| Work in a mapped floodplain | Extra rules can apply to repairs after flood damage |
Large water losses often reach at least one of these. A basement flood that submerges outlets and the furnace involves electrical and mechanical work even if the walls are simply being re-covered.
Who obtains the permit
Usually the contractor doing that part of the work: the electrician for electrical, the plumber for plumbing, the general contractor for structural. Ask each one, and ask for the permit number. A homeowner can often apply for work on their own home, but the rules vary.
Why bother
- An inspection is an independent check that the repair is safe.
- Unpermitted work can cause problems when you sell.
- If something later goes wrong, an insurer may ask whether the work was permitted.
- Work done without a required permit may have to be opened up again.
Timing
The permit question belongs to the rebuild, not the emergency. A sensible order is: dry the house, agree the rebuild scope, ask the building office what that scope requires, then start. The drying days give you time to make the call.
Floodplain repairs
If your home is in a mapped flood hazard area and was damaged by flooding, additional rules can apply to how it is repaired. This is a specialized area. Ask your local floodplain administrator before you rebuild. What the cleanup itself involves is on our flood damage page.
Historic homes
A house in a historic district may be subject to design review for exterior changes. Interior repairs after water damage are usually not affected, but check before altering windows, siding or roofing.
If work was already done without one
It happens, especially after an emergency. If you learn that a repair needed a permit and did not get one, call the building office and ask how to put it right. Many offices can issue a permit after the fact and inspect the work, though parts of it may need to be opened so the inspector can see inside. Sorting it out now is easier than discovering it during a sale.
A short script for the phone call
"I had water damage at this address. We need to replace this much drywall and flooring, and also this electrical, plumbing or structural item. Which of that needs a permit, and who should apply?"
Write down the name of the person, the date and what they said.
Permit Offices in and Around Delaware, Ohio
City of Delaware. The Building Division is a state-certified building department within Planning and Community Development, at City Hall Annex, 1 South Sandusky Street. The city says structural, electrical or mechanical work likely requires a permit. Plumbing permits are issued by the Delaware County Health District, not the city. Source type: the city's Building Division page.
Floodplain. The city has flood damage reduction regulations under Chapter 1347 of its code and takes part in the National Flood Insurance Program. Ask the city about repairs to a flood-damaged building in a mapped area. Source type: the city's floodplain regulations page.
Ostrander. The village issues its own zoning and building permits, and says permanent structural items need a Delaware County permit in addition. Source type: the village's permits page. See our Ostrander page.
Unincorporated places. Lewis Center, Kilbourne and Radnor have no city building department. Ask the township about zoning and the county about building permits. We have not verified current fees or processing times for any office and state none.
Permit Questions
Where do I get a plumbing permit in the City of Delaware?
From the Delaware County Health District. The city's Building Division handles structural, electrical and mechanical permits but states that plumbing permits go through the Health District.
Do I need a permit to replace drywall after a leak?
Usually not for a like-for-like repair, but confirm with your building office, especially if wiring or framing behind it is also being replaced.
Can drying start before I have a permit?
Yes. Extraction, removal of wet materials and drying are not permitted work. Start them immediately.